Full procedure Add a second storey to a house
A second storey on an existing private house in a city or district town.
Obtain an extract from the land register
Extract of the land department of the district administration, valid 30 days.
- 1. Request the extract
Where: Land department of the district administration
Bring: ID card or passport of the applicant
You receive: Extract from the land register
Cost: IS 25
Time: 30–150 min in the queue, 10–15 min at the counter, 5–10 days until the next step
Update the technical passport of the house
Measurement of the existing house by the Technical Inventory Bureau.
- 2. Order the measurement and receive the surveyor
Where: Technical Inventory Bureau
Rooms built since the last measurement and not on the passport must be legalised before a storey can be added on top of them.
Bring: Extract from the land register, ID card or passport of the applicant
You receive: Technical passport of the house
Cost: IS 160
Time: 30–120 min in the queue, 60–120 min at the counter, 14–30 days until the next step
Obtain a seismic zoning certificate
Certificate of the seismic laboratory of the Faculty of Geography and Earth Sciences, Talas State University.
- 3. Apply with the land register extract
Where: Seismic laboratory of the Faculty of Geography and Earth Sciences
Bring: Extract from the land register
You receive: Seismic zoning certificate for the plot
Cost: IS 140
Time: 10–40 min in the queue, 10–15 min at the counter, 10–20 days until the next step
Have the structure surveyed
Survey by a licensed engineer of whether the walls and foundations can carry a second storey.
- 4. Commission the survey
Where: Architecture and Planning Department, City Hall
Houses of the Russian grid in Talas (single-storey brick, iron-roofed porches) generally have foundations for one storey only.
Bring: Technical passport of the house, Seismic zoning certificate for the plot
You receive: Structural survey by a licensed engineer
Cost: IS 12 per m²
Time: 0 min in the queue, 120–240 min at the counter, 10–20 days until the next step
Have the design drawn by a licensed architect
Design drawings in four copies, stamped by the architect.
- 5. Commission the design
Where: Architecture and Planning Department, City Hall
Bring: Technical passport of the house, Structural survey by a licensed engineer, Seismic zoning certificate for the plot
You receive: Design drawings by a licensed architect
Cost: IS 25 per m²
Time: 0 min in the queue, 60–120 min at the counter, 20–40 days until the next step
Collect the consents of the neighbours and the household
Notarised consents of the owners of all adjoining plots, of the spouse and of all adult members of the household.
- 6. Have the neighbours' consents notarised
Where: State Notary Office No. 1
Each neighbour signs in person. A neighbour who lives abroad signs at a notary there, with an apostille, and an Iradi translation.
Bring: Extract from the land register, Design drawings by a licensed architect
You receive: Notarised consent of the owners of all adjoining plots
Cost: IS 45 per neighbour
Time: 40–150 min in the queue, 15–20 min at the counter, 1–14 days until the next step - 7. Have the household's consents notarised
Where: State Notary Office No. 1
Under the Domestic Relations Act 1996 the house is joint property of the spouses. Adult children registered at the address sign as members of the household, also if they live elsewhere.
Bring: Technical passport of the house, ID card or passport of the applicant
You receive: Consent of the spouse and of all adult members of the household
Cost: IS 45 per person
Time: 40–150 min in the queue, 15–30 min at the counter, 0–1 days until the next step
Obtain technical conditions for electricity and water
Conditions of Iradenergo and of the city water enterprise for the larger house.
- 8. Apply to Iradenergo
Where: Talas Electric Networks: connections department
Bring: Design drawings by a licensed architect, Technical passport of the house
Cost: IS 95
Time: 30–150 min in the queue, 10–15 min at the counter, 10–20 days until the next step - 9. Apply to the water enterprise
Where: City water enterprise
Bring: Design drawings by a licensed architect, Technical passport of the house
You receive: Technical conditions for electricity and water
Cost: IS 70
Time: 30–120 min in the queue, 10–15 min at the counter, 10–20 days until the next step
Have the design approved for fire safety
Approval of the State Fire Inspectorate.
- 10. Submit the design
Where: State Fire Inspectorate
Bring: Design drawings by a licensed architect
You receive: Fire-safety approval of the design
Cost: IS 120
Time: 15–60 min in the queue, 15–20 min at the counter, 7–15 days until the next step
Obtain Heritage Department approval
Required in the Old Talas Citadel Quarter, the Russian grid and other protected zones.
- 11. Submit the design and photographs of the street front ★ optional
Where: Heritage Department
A second storey in the Old City is allowed only where it is set back and cannot be seen from the lane.
Bring: Design drawings by a licensed architect, Two photographs, 3.5 × 4.5 cm
You receive: Heritage Department approval (protected zones)
Cost: IS 100
Time: 20–60 min in the queue, 20–30 min at the counter, 30–60 days until the next step
Obtain height clearance near Talas Air Base
Clearance for houses in the approach zone of Talas Air Base, through the Roads Department, which liaises with the base.
- 12. Submit the height of the new roof ★ optional
Where: Roads Department
Bring: Design drawings by a licensed architect, Extract from the land register
You receive: Height clearance (Talas Air Base approach zone)
Time: 0 min in the queue, 10–15 min at the counter, 20–45 days until the next step
Obtain the building permit
Permit of the Architecture and Planning Department under the Territorial Building Code 1996.
- 13. Pay the fee at Talasbank
Where: Talasbank (any branch)
Cost: permit fee per m², IS 2.50 per m²
Time: 20–60 min in the queue, 5–10 min at the counter, 0–1 days until the next step - 14. Submit the application with all approvals
Where: Architecture and Planning Department, City Hall
The land register extract must still be valid on the day of application; if it has expired, request a new one.
Bring: Extract from the land register, Technical passport of the house, Seismic zoning certificate for the plot, Structural survey by a licensed engineer, Notarised consent of the owners of all adjoining plots, Consent of the spouse and of all adult members of the household, Design drawings by a licensed architect, Technical conditions for electricity and water, Fire-safety approval of the design, Heritage Department approval (protected zones), Height clearance (Talas Air Base approach zone)
You receive: Building permit
Time: 30–150 min in the queue, 20–40 min at the counter, 30–45 days until the next step
Have the new storey commissioned
Inspection on completion and act of commissioning; the technical passport is then updated again.
- 15. Receive the commissioning inspection
Where: Architecture and Planning Department, City Hall
Bring: Building permit, Design drawings by a licensed architect
You receive: Act of commissioning
Cost: IS 150
Time: 0 min in the queue, 60–120 min at the counter, 10–20 days until the next step - 16. Have the technical passport updated
Where: Technical Inventory Bureau
Bring: Act of commissioning, Technical passport of the house
Cost: IS 160
Time: 30–120 min in the queue, 60–120 min at the counter, 14–30 days until the next step
Laws and documents
- № 96-17 Territorial Building Code 1996 (article 21; articles 30, 31; article 24; articles 21, 24, 30, 41; articles 52, 55)
- № 96-03 Domestic Relations Act 1996 (articles 14, 22)
- Fire Safety Rules FSR-01 Fire Safety Rules for premises and storage, 2003 (section 20)
- № 97-05 Heritage Ordinance 1997 (articles 6, 9)
Institutions
- Land department of the district administration, District administration building, ground floor. Monday to Thursday, 9:00–12:30
- Technical Inventory Bureau, District administration building; in Talas, Kirpich Street 5. Monday to Friday, 9:00–17:00, lunch 12:30–13:30
- Seismic laboratory of the Faculty of Geography and Earth Sciences, Talas, University Street 12, building G, basement. Thursday, 10:00–13:00
- Architecture and Planning Department, City Hall, Talas City Hall, third floor, rooms 301–309; Nurzhan: House of Soviets, wing B. Applications: Monday and Wednesday, 14:00–17:00
- State Notary Office No. 1, Talas, Liberty Boulevard 9, basement; sworn translators' list on the door. Monday to Friday, 9:00–17:00, lunch 12:30–13:30
- Talas Electric Networks: connections department, Talas, Energetikter Street 8, window 5; Nurzhan Electric Networks for Nurzhan and Chu District. Monday to Friday, 9:00–17:00, lunch 12:30–13:30
- City water enterprise, Talas City Water Enterprise, Suu Street 2; Nurzhan Vodokanal; Iyık Janyl City Water Enterprise. Monday to Friday, 9:00–17:00, lunch 12:30–13:30
- State Fire Inspectorate, Fire station of your district; in Talas, Fire Station No. 1, Trans-Talas Highway 33. Monday to Friday, 9:00–17:00, lunch 12:30–13:30
- Heritage Department, Talas, National Historical Museum, administrative entrance. Monday to Thursday, 9:00–12:30
- Roads Department, Talas, Liberty Boulevard 14, second floor (the e-Government Service Centre is on the ground floor). Monday to Thursday, 9:00–12:30
- Talasbank (any branch), Any of the 28 branches; foreign currency operations at the head office, Central Square, Talas. Monday to Friday, 9:00–16:00; Saturday 9:00–12:00
Updated 2026-10-23. Developed with the support of the UNMI trade facilitation programme.